Projects / Housing complex Artemis

Housing complex Artemis - 14.097

Program

Complete mission for civil and structural engineering.

Concept

Construction of 100 apartments according to passive standards on the parcel between Artémis Avenue and Franz Guillaume Avenue in Evere. In accordance with the 'individual plans of allotment', the housings are distributed in 6 buildings separated from each other in order to form a semi open street block.

Specific features

The floors are constructed by the use of pre-stressed pre-slabs which serve as permanent formworks while helping meet the deformation criteria. The loadbearing walls of the super structure are realized using sand-lime blocks, with the exception of the ground floor for which reinforced concrete is used in favor of a guaranteed transfer of forces towards the loadbearing elements of the underground parking. The stability of the loggias, cantilevered from the façades, is insured by steel tie-rods transferring the forces to the floor slabs.

  • 2014

  • MDW Architecture

  • Brussels Housing Corporation (SLRB)

  • Brussels, Belgium

  • 19000 m2

  • 13500000 € Vat Excl.

  • In Study
  • Ney & Partners - MDW Architecture