Projects / Bridge Molenbeek

Bridge Molenbeek - 11.048

Program

Complete study

Concept

On the Mill Brook ('Molenbeek') near Leuven was a small steel bridge with wooden. Both the bridge and abutments were in pour condition. As a local connection for pedestrians, cyslists and farmers the bridge is valuable.

Specific features

The goal is to design a bridge without any finishes. The bridge consists of five prefabricated concrete beams. No finishes or maintenance is required for the bridge. The abutments have been demolished, and replaced by welded wire mesh baskets and natural stone.

  • 2011-2012

  • 2012

  • Ney & Partners

  • City of Leuven

  • Leuven, Belgium

  • 7 m

  • 130000 € Vat Excl.

  • Completed